Axiom Space: Assembly Integration & Testing Facility
HOUSTON, TX, USA
Lam Research
CALIFORNIA, USA
Paragon (Confidential Client)
Baylor Scott & White Health System Distribution Center
FORT WORTH, TEXAS, USA
We designed an approximately 152,000 SF Distribution Center and supporting administrative facilities. This is a concrete tilt-up constructed building designed for the expansive soil conditions of the area. The facility will also have an administrative/office area, including computer room, conference rooms, break room, and restrooms. BS&W plans to expand this facility in future phases up to approximately 500,000 SF through building expansion and separate future buildings on the site, including possible future medical record storage facility.


Corning LCD Glass Manufacturing
TAIWAN
This $500+ million project required design review, construction, and commissioning. Corning manufactures LCD glass for laptops, TVs, and desktop monitors, and produces large glass substrate, 1.8m square from continuous process (0.7mm thick). The Corning process advantage is glass formed in air resulting in pristine surface.
Corning required approximately a 160-foot tall building and a process layout critical to process flow both horizontally as well as vertically. We built raw material silos on one end, furnaces built under strict Corning supervision and located at top of building, highly-automated robotics to wash/handle final glass substrate. Central utilities included large quantities of chilled water, cooling tower water, steam, fire water, service water, instrument/plant air, nitrogen, LPG/NG, city water, hot water, DI water, 18.1 megaohm ultra pure water, detergent, and wastewater. This project required significant HVAC design.
The Buccini/Pollin Group and E. J. Deseta Office and Manufacturing Building
WILMINGTON, DELAWARE, USA
The 322 A Street Office and Manufacturing Building is the first phase in the redevelopment of the south side of the Christina River. The site is very close to the city center, and its north side looks directly at the city skyline across the river. The building serves as the new home for The Buccini/Pollin Group, a real estate development company, and E. J. DeSeta, a metal fabrication company.


Beijing Tide Pharmaceutical Facility 1
BEIJING, CHINA
The R&D facilities at the Factory 1 site are designed to support a variety of products in Beijing Tide (BT) over the next decade. These products are represented by five technology platforms including bio-technology, micro-sphere target preparation, liposome target preparation, oral solid formulation, and transdermal (patch) products. New facilities will significantly support and meet the demand for the development, optimization, and registration of new BT drug products and BT’s patented drug portfolio.
The new design is based on Tide’s commitment to its people, the environment, and its future growth in pharmaceutical research, development, and production. The proposed site organization reflects patterns of movement by people and materials, and a governing concern for safety. The design offers sophistication and environmental enhancement while sympathizing with the existing context.
Glaxosmithkline Commercial Manufacturing Facility
MARIETTA, PENNSYLVANIA, USA
GSK Biologicals commissioned us to design a new bulk biological production facility that manufactures cell culture derived vaccines for pandemic and seasonal flu. Project scope included GMP manufacturing to BSL-3 levels, along with warehouse, administration, amenities, and central utilities functions.
The design provides a best-in-class facility that allows GSK Biologicals to leverage their investment for other potential biological applications, utilize innovative technologies, and employ execution strategies to meet the aggressive timeline commitments as part of their HHS contract. Jacobs, in partnership with CRB, provided full programming, planning, architecture, site/civil, interiors, engineering and process design services for the conceptual design and basis of design.
